Gujarat Data Centre Policy: ₹6 lakh crore investment and 7.5 GW capacity target

General Studies · Governance · GS III · Indian Economy · Science & Tech

Why in News?

The Gujarat government unveiled its first-ever dedicated Data Centre Policy (2026-29) on July 9, 2026. Chief Minister Bhupendra Patel launched the policy in Gandhinagar, pitching the state as India’s preferred destination for hyperscale data centres, cloud computing and AI-driven digital infrastructure, The Hindu reported.

The policy targets investments of ₹6 lakh crore and the creation of 7.5 GW of data centre capacity over the three-year policy period — a striking number against India’s current installed base of roughly 2-3 GW across about 200 data centres.

The development matters in the context of:

Rows of server racks inside a modern data centre corridor
Hyperscale data centres like those targeted by Gujarat's new policy house thousands of servers with heavy power and cooling demands. Photo: Swilsonmc, CC BY-SA 3.0 (Wikimedia Commons)
Gujarat Data Centre Policy: ₹6 lakh crore investment and 7.5 GW capacity target — quick facts

UPSC Relevance

Prelims Relevance

Mains Relevance

GS Paper 3

GS Paper 2

Essay

Background and Context

What the Gujarat Data Centre Policy 2026-29 offers

The policy bundles fiscal and non-fiscal incentives designed for capital-heavy hyperscale projects.

Gujarat Data Centre Policy: ₹6 lakh crore investment and 7.5 GW capacity target — exam lens

The sustainability conditions built into the policy

Gujarat has tied its incentives to green power and non-competing water use — unusual detail for a state industrial policy.

Why states are racing for data centres: the demand math

The investment case rests on a stark mismatch between the data India produces and the capacity it hosts.

Dholera: the designated data centre city

The policy’s spatial bet is Dholera, the greenfield special investment region south of Ahmedabad.

The central policy scaffolding beneath state schemes

Gujarat’s subsidies stack on top of an increasingly generous central regime for digital infrastructure.

Competitive federalism: how other states compare

Gujarat is a late but aggressive entrant into a field several states already occupy.

Way Forward

Grid and green-power readiness

Guard against incentive over-reach

Water and local-economy safeguards

Conclusion

Gujarat’s Data Centre Policy 2026-29 is the clearest sign yet that digital infrastructure has become the new battleground of state industrial policy. The ₹6 lakh crore and 7.5 GW targets are ambitious against India’s current 2-3 GW base, but the proposal pipeline of 10 GW suggests genuine investor appetite in the AI build-out cycle.

For the exam, treat this as a layered story: a global demand-supply gap (20% of data, 3% of capacity), a central scaffolding (infrastructure status, 20-year tax holiday), and state-level competitive federalism with sustainability conditions attached. The green-energy and desalination mandates are the policy’s most examinable design features — and its hardest tests.

UPSC Practice Questions

Prelims MCQ 1

With reference to the Gujarat Data Centre Policy (2026-29), consider the following statements:

  1. It targets investments of ₹6 lakh crore and the creation of 7.5 GW of data centre capacity.
  2. It mandates that at least 51% of the electricity consumed by data centres must come from green energy sources.
  3. It is the first data centre policy announced by any Indian state.

How many of the above statements are correct?

(a) Only one (b) Only two (c) All three (d) None

Answer: (b) Only two

Explanation:

Statements 1 and 2 are correct — the policy targets ₹6 lakh crore and 7.5 GW, with a 51% green-energy mandate and desalination-based water sourcing. Statement 3 is incorrect: it is Gujarat’s first dedicated data centre policy, but states such as Telangana, Maharashtra, Tamil Nadu and Uttar Pradesh already have their own data centre policies.

Prelims MCQ 2

Which of the following best describes the ‘infrastructure status’ granted to data centres in India in 2022?

(a) All data centres were exempted from corporate income tax for 20 years (b) Data centres above 5 MW IT load were included in the Harmonised Master List, easing access to long-tenor institutional credit (c) Data centres were brought under the regulatory control of TRAI (d) State governments were barred from levying electricity duty on data centres

Answer: (b) Data centres above 5 MW IT load were included in the Harmonised Master List, easing access to long-tenor institutional credit

Explanation:

In 2022 the Centre included data centres with IT load above 5 MW in the Harmonised Master List of infrastructure sub-sectors. This improves access to cheaper, longer-tenor financing. The 20-year tax holiday is a separate Union Budget 2026 announcement, not part of infrastructure status.

UPSC Mains Questions

  1. Data centres are the physical backbone of the digital economy, but they are intensive consumers of land, power and water. In the light of Gujarat’s Data Centre Policy 2026-29, examine how states can attract digital infrastructure investment without compromising energy and water sustainability.
  2. Competition among Indian states to attract data centre investments reflects both the promise and the perils of competitive federalism. Discuss, with reference to recent state data centre policies and the Centre’s enabling measures for the sector.

Source: The Hindu.

Frequently Asked Questions

What is the Gujarat Data Centre Policy 2026-29?

It is Gujarat’s first dedicated policy for data centres, launched on July 9, 2026 by Chief Minister Bhupendra Patel. It targets ₹6 lakh crore of investment and 7.5 GW of data centre capacity over 2026-29 through capital, interest, power-tariff and SGST incentives plus stamp-duty exemption.

What are the key incentives under the policy?

A 2.5% capital subsidy for Dholera-region projects, interest subsidy up to 4% for 10 years (capped at ₹25 crore a year), ₹1 per unit power-tariff subsidy and 100% electricity-duty reimbursement for 20 years, SGST reimbursement, stamp-duty exemption, and desalination-plant assistance of 20% of capex or ₹2 crore per MLD.

What green conditions does the policy impose?

At least 51% of the electricity consumed by data centres must come from green energy sources, and water requirements must be met through captive desalination plants rather than supplies meant for agriculture or industry.

Why is Dholera central to the policy?

The capital subsidy is tied to the Dholera region, where investor demand already exceeds twice the policy’s 7.5 GW target. With an upcoming airport, a proposed semi-high-speed rail link to Ahmedabad and Global Capability Centre plans, the state projects Dholera as a future data centre city.

How big is India’s data centre gap?

India generates nearly 20% of the world’s data but hosts only about 3% of global data centre capacity — roughly 200 data centres totalling 2-3 GW, against about 5,500 in the United States. The US and China together hold nearly 70% of global capacity.

Is this India’s first state data centre policy?

No. It is Gujarat’s first dedicated data centre policy. States such as Telangana, Maharashtra, Tamil Nadu and Uttar Pradesh already operate data centre policies; UP approved its Data Centre Policy 2026 two days before Gujarat’s launch.