Write a note on India’s green energy corridor to alleviate the problems of conventional energy.

Subtopic: Sustainable Development · Renewable energy grid integration

Model answer outline

How to structure your answer

Introduction: Define the Green Energy Corridor as a dedicated transmission network for renewable power.

Body: (1) Why it is needed — variability and grid-stress of clean power; (2) what it builds — intra-state and inter-state lines, substations, control centres; (3) how it eases conventional-energy problems — cuts coal dependence, emissions and import bills.

Conclusion: Position it as the backbone of the non-fossil transition.

Full model answer

Written within the word limit

153 words · target 150 words · 9 min

Introduction: The Green Energy Corridor (GEC) is a dedicated transmission network, steered by the Ministry of New and Renewable Energy, built to carry power from large solar and wind zones into the national grid.

Why it is needed: Renewable output is variable and clustered in a few resource-rich states, while the older grid was designed around steady coal and hydro plants. Without firm evacuation lines, clean power gets curtailed and stranded.

What it builds: Intra-state and inter-state high-voltage lines, new substations and Renewable Energy Management Centres for forecasting and balancing. Phase-I and Phase-II together target thousands of circuit-kilometres and added transformation capacity, part-funded by central grants.

How it helps: By smoothly evacuating wind and solar, it lets fossil generation be backed down, trimming coal use, carbon emissions and fuel imports, and supporting the 500 GW non-fossil goal for 2030.

Conclusion: The corridor is the grid backbone that turns scattered renewable potential into reliable, low-carbon supply.

Key points

What an examiner expects to see

  • GEC is implemented by MNRE to evacuate renewable power into the national grid
  • Intra-State GEC Phase-I (2015): ~9,700 ckm of lines and ~22,600 MVA substations across resource-rich states
  • Intra-State GEC Phase-II (approved 2022): ~10,750 ckm of lines and ~27,500 MVA substations
  • Inter-State GEC component adds long-distance lines and HVDC terminals, including the Ladakh evacuation link
  • Includes Renewable Energy Management Centres (REMCs) for forecasting and grid balancing
  • Funded partly by central financial assistance plus low-cost loans (e.g. KfW)
  • Reduces curtailment, lets coal plants be backed down, cutting emissions and fuel imports
  • Supports the 500 GW non-fossil capacity target by 2030
Examples to use

Concrete cases, schemes and judgments

  • Intra-State GEC Phase-I and Phase-II
  • Ladakh inter-state transmission link with HVDC terminals
  • Renewable Energy Management Centres (REMCs)
  • Solar and wind resource-rich states: Rajasthan, Gujarat, Tamil Nadu, Karnataka, Andhra Pradesh
Keywords / terms

Terminology to weave into the answer

Green Energy Corridorrenewable evacuationintra-state and inter-state transmissionREMCgrid integrationcircuit-kilometre500 GW non-fossil targetcurtailment
Sources to read

Primary sources and verified references

MNRE — Green Energy Corridors https://mnre.gov.in/en/green-energy-corridors/ Ministry of Power — Green Energy Corridor https://powermin.gov.in/en/content/green-energy-corridor Ministry of Power — 500 GW Non-Fossil Fuel Target https://powermin.gov.in/en/content/500gw-nonfossil-fuel-target

Share this answer