Disaster preparedness is the first step in any disaster management process. Explain how hazard zonation mapping will help in disaster mitigation in the case of landslides.
Subtopic: Disaster Management · Landslide hazard zonation & mitigation
How to structure your answer
Introduction: Define landslide hazard zonation (LHZ) mapping and link preparedness to mitigation.
Body: (1) What LHZ maps capture and at what scales; (2) How they aid mitigation — land-use control, engineering, early warning, insurance; (3) The institutional setup (GSI as nodal agency).
Conclusion: Stress mainstreaming LHZ into development planning.
Written within the word limit
225 words · target 250 words · 11 min
Introduction: Landslide Hazard Zonation (LHZ) mapping divides terrain into zones of low, moderate and high susceptibility to slope failure, weighing slope angle, rock type, soil, rainfall, drainage, land use and seismicity. As a preparedness tool it lets planners act before the slope fails rather than clean up after — the essence of mitigation. About 12–15% of India, mainly the Himalaya, Northeast hills and Western Ghats, is landslide-prone.
How zonation maps aid mitigation:
- Land-use regulation: High-hazard zones can be kept free of new settlements, schools and hospitals, and vulnerable structures relocated — cutting exposure at source.
- Engineering and route planning: Maps guide retaining walls, slope drainage, bio-engineering and the safest alignment for roads, railways, dams and hydel projects in hilly terrain.
- Early warning and response: Identifying critical zones lets agencies install rain-threshold and slope sensors, prioritise monitoring, and pre-position NDRF teams and relief.
- Financial and awareness tools: Zonation underpins risk-based insurance, hill-area building codes and community awareness in mapped villages.
Scales and institutions: The Geological Survey of India is the nodal agency, producing macro-scale maps at 1:50,000 and finer meso and micro-scale maps for critical road corridors and settlements; the NDMA guidelines of 2009 recommend mainstreaming these into planning.
Conclusion: A hazard map only mitigates if it is enforced — embedding LHZ in district development plans, building bye-laws and project clearances is what turns a map into real safety on the ground.
What an examiner expects to see
- Landslide Hazard Zonation (LHZ) classifies terrain into low/moderate/high susceptibility zones
- Causative factors mapped: slope angle, lithology, soil, rainfall, land use, drainage and seismicity
- Geological Survey of India (GSI) is the nodal agency for landslide hazard zonation
- Macro-scale maps at 1:50,000; meso and micro-scale maps for critical road corridors and settlements
- Roughly 12–15% of India's landmass is landslide-prone, mainly Himalaya, NE hills and Western Ghats
- Mitigation uses: land-use zoning, slope engineering, safe route alignment, rain-threshold early warning
- Zonation supports building codes, risk-based insurance and community awareness
- NDMA Guidelines on Management of Landslides and Snow Avalanches (2009) recommend LHZ mainstreaming
Concrete cases, schemes and judgments
- Geological Survey of India (GSI) national landslide susceptibility mapping programme
- 2013 Kedarnath and 2021 Chamoli disasters (Uttarakhand Himalaya)
- Western Ghats / Wayanad landslides, Kerala
- NDMA Guidelines on Management of Landslides and Snow Avalanches, 2009
- Bhukosh / Bhusanket landslide portals of GSI