India’s solar capacity has crossed 100 GW but PM-Surya Ghar Muft Bijli Yojana is now the lever for rooftop solar. Examine progress, financing and integration challenges.
Subtopic: Environment · Energy and pollution
How to structure your answer
Introduction: Installed solar capacity crossed 100 GW in early 2025 (MNRE); PM-Surya Ghar Muft Bijli Yojana approved 29 February 2024 with ₹75,021 crore outlay to install rooftop solar in 1 crore households by FY27.
Body: 1) Mechanics — central financial assistance up to ₹78,000/household; ~300 units/month free. 2) Challenges — DISCOM net-metering caps, vendor onboarding, financing for low-income households. 3) Grid integration — RE round-the-clock tenders, BESS PLI ₹18,100 crore.
Way forward: Mandatory gross-metering above 10 kW; deepen Surya Ghar finance through PSL; co-locate with BESS for evening peak.
Written within the word limit
139 words · target 150 words · 9 min
Introduction: India's installed solar capacity crossed 100 GW in early 2025 per MNRE; the PM-Surya Ghar Muft Bijli Yojana was approved on 29 February 2024 with a ₹75,021 crore outlay to install rooftop solar in 1 crore households by FY27, anchoring household-level distributed generation.
Body: First, scheme mechanics — Central Financial Assistance of up to ₹78,000 per household, ~300 free units per month, collateral-free loans up to ₹2 lakh at 7%, and DBT-linked subsidy disbursal. Second, challenges — DISCOM net-metering caps, vendor onboarding bottlenecks, and finance access for low-income households remain binding constraints, alongside ALMM List I and II compliance. Third, grid integration — RE round-the-clock tenders and BESS PLI (₹18,100 crore) address evening-peak mismatch; PM-KUSUM solarises agricultural pumps; Bhadla and Pavagada parks anchor utility scale.
Way forward: Move to gross-metering above 10 kW, route Surya Ghar finance through Priority Sector Lending, co-locate rooftop solar with BESS, and finalise net-metering harmonisation under MNRE by 2027.
What an examiner expects to see
- Installed solar capacity crossed 100 GW (MNRE 2025)
- PM-Surya Ghar Yojana approved 29 February 2024
- Outlay ₹75,021 crore for 1 crore households
- CFA up to ₹78,000 per household
- BESS PLI ₹18,100 crore
- ALMM List I and List II for solar modules
Concrete cases, schemes and judgments
- Modhera Sun Temple village solar project
- PM-KUSUM solarisation of pumps
- Bhadla and Pavagada solar parks